
TPO roofing
Heat-welded seams, attachment and the underlying assembly.

Free inspection. A roofer walks the roof.
Treat the roof as part of the operating building. Put its membrane, drainage and moisture condition beside the spaces and equipment that depend on it.
A leak over a tenant suite is a different operating problem from a leak over storage or a loading dock. Begin with the affected space, access and anything below the roof that needs protection. Then put those needs beside the actual assembly.
On low-slope roofs, the inspection concentrates on the membrane, seams, drainage and transitions around walls and rooftop equipment. Moisture below the visible surface can change the repair decision and the viability of a restoration system.
A replacement plan needs the existing layers, deck, insulation and attachment addressed together. A coating plan needs a roof that qualifies for it. A targeted repair needs sound surrounding material and a reliable way to close the entry route.
Across Dallas-Fort Worth, a working property may combine offices, shops, storage and residential use. The spaces below the roof can need different protection even when they share one roof assembly. Discussing that use early helps put the repair or replacement into a workable building plan.

The options depend on what the building already has.
| Path | Useful when | What must be resolved |
|---|---|---|
| Targeted repair | A defined defect can connect to sound material. | The water route, compatible detail and extent of underlying moisture. |
| Coating restoration | The roof is a suitable, dry and stable candidate. | Moisture mapping, adhesion, drainage and all required repairs before application. |
| Replacement | The existing system cannot support dependable continued service. | Removal or recover limits, deck, insulation, drainage, attachment and keeping the building protected. |
Choose the roof system or the work your building needs.

Heat-welded seams, attachment and the underlying assembly.

Water entry at seams, drains, curbs and penetrations.

Candidate qualification before the restoration system.
Roof access alone does not describe a workable project.
Discuss occupied areas, inventory, loading and equipment below the affected roof.
The surface condition and moisture underneath determine what each option can reasonably achieve.
Access, material staging, protected openings and coordination around rooftop services belong in the actual project scope.
No. Wet insulation, unstable material, poor adhesion or unresolved drainage can disqualify a roof or require substantial corrective work first. Coatings do not remove moisture trapped below them.
Roofing details around a unit are different from repairs to the mechanical equipment itself. The project can need coordination with the equipment trade where the work crosses that boundary.
Occupied use is part of the planning conversation. Tell us the access restrictions and spaces affected by leaks so the inspection request starts with the actual operating conditions.
Share the property location, the roof concern and the operating conditions that matter. Request a free commercial roof inspection.
(945) 390-2340Free inspection.
A roofer walks the roof.